top of page

Tooting Bec Lido

WR-AP Tooting Bec Lido Pool View

Following WR-AP’s winning competition entry in May 2022, the South London Swimming Club has appointed WR-AP to work collaboratively with them to redevelop a new public entrance swimming and changing facility at Tooting Bec Lido in South West London. A beach within the city, its brightly coloured changing facilities are reminiscent of the English seaside and it has been a haven for local people since 1906.

WR-AP Tooting Bec Lido Entrance Render

The proposals form part of a wider masterplan for the historic site that began five years ago with the opening of a new pavilion building (2017) and current plans to re-line the swimming pool, alongside the creation of a new pump house and efficient filtration system. WR-AP’s competition winning entry seeks to create a net zero carbon facility that will incorporate sustainable measures including GSHP, solar panels, a grey water system for toilets and the potential to harness heat from the one-million-gallon filtration system to boost water temperature for showers.

WR-AP Tooting Bec Lido Architectural Model
WR-AP_TBL_Site Diagram.jpg

Date of completion: TBC

Total Cost: Confidential

Gross internal Floor Area: 275 sqm

Client: South London Swimming Club

Structural Engineer: Studio Allen

MEP: Mstep

Energy and sustainability: Mstep

QS: White & Lloyd

wr-ap_tbl_Icon.jpg
bottom of page